| Facility |
Pyrolysis incinerator |
Rotary kiln incinerator |
| Existing |
Newly built facility |
| Commissioning time |
2000 |
2011 |
| capacity |
3300tons/year |
9000tons/year |
| Synopsis |
Designed and Built by Dong Tai according to GB 18484-2001<Pollution control standard for hazardous wastes incineration>, the technology was promoted as a key environmental protection technology by Environmental Protection Administration in the period of “the tenth five years plan”. |
Designed by Takuma Co.,Ltd, Japan and builted by Cottrell Co.,Ltd, South Korea. |
| Waste stream |
Solid waste |
Solid and liquid waste |
| Treatment manner |
Batched feeder,two phase pyrolysis incineration |
Continuous feeder, rotary kiln incinerator |
| Treatment Principle |
Reduce the volume , eliminate the hazard |
| The newly built incinerator will increase incineration capacity by approximatly three times, and is able to handle liquid waste; the new incinerator will be designed following higher emission standard, and will be equipped with automatic control system. |