Home > Facilities
 
Hazardous waste safety landfill site
Facility Hazardous waste safety landfill site
Phase 1 Phase 2
Commissioning time 1999 2009
Capacity 13000tons 27000tons
Synopsis Hazardous waste safety landfill is designed & built according to American standards, facilitated with double lining and leachate collection system. The landfill operates in full compliance with GB 18598-2001 < Standard for pollution control on the security landfill site for hazardous wastes>.
Waste stream Heavy metal bearing sludge, water treatment sludge ,incineration slag, flying ashes etc.
Treatment manner solidification and landfill
Treatment Principle Innocuous treatment of waste
Total capacity will reach 40000 tons when phase 2 is completed

Home Contact Us
©2008 China Industrial Waste Management, Inc. All rights reserved
技术支持:清风网络 辽ICP备09011265号