| Facility |
Hazardous waste safety landfill site |
| Phase 1 |
Phase 2 |
| Commissioning time |
1999 |
2009 |
| Capacity |
13000tons |
27000tons |
| Synopsis |
Hazardous waste safety landfill is designed & built according to American standards, facilitated with double lining and leachate collection system. The landfill operates in full compliance with GB 18598-2001 < Standard for pollution control on the security landfill site for hazardous wastes>. |
| Waste stream |
Heavy metal bearing sludge, water treatment sludge ,incineration slag, flying ashes etc. |
| Treatment manner |
solidification and landfill |
| Treatment Principle |
Innocuous treatment of waste |
| Total capacity will reach 40000 tons when phase 2 is completed |