|
Industrial effluent treatment facility
| Facility |
Industrial effluent treatment |
| Existing |
Expanded facility |
| Commissioning time |
2003 |
2011 |
| Capacity |
18000tons/year |
30000tons/year |
| Synopsis |
The industrial effluent treatment facility was built in 1995; the system was expanded to a capacity of 18000tons/year in 2003, and was relocated to the existing site in the same year. The system will serve as supporting facility in the extension project, capacity for phase 1 in extension project is 30000 tons/year, capacity for phase 2 will reach 50000-100000 tons/year |
| Waste stream |
Heavy metal bearing water, oil-containing water, sewage , runoff |
| Treatment manner |
Physical, chemical and biochemical technique |
| Treatment Principle |
Innocuous treatment |
 |
|