Dalian DongTai Industrial Waste Treatment Co., Ltd
Dalian Dongtai has invested in a hazardous waste management extension project in Dalian, which is expected to be put in operation in 2011. When the project is completed, it will centralize our wide range of waste management services and allow for necessary increase in capacity to meet increasing demand . For more information about our new facility view the following:
| Facility |
Description |
scale |
| existing |
After expansion |
| Incinerator |
Incineration System for Solid Waste |
3300t/y |
9000t/y |
Hazardous Waste Landfill |
Hazardous Waste Safe Landfill |
13000t |
40000t |
| Ordinary Industrial Solid Waste Landfill |
Ordinary Industrial Waste Landfill for CategoryⅠandⅡ |
200000t |
—— |
| Industrial Effluent Treatment System |
Industrial Sewage Treatment |
18000t/y |
25000t/y |
| Waste Etchant Treatment System |
Cupric Sulfate Producing by Using Etchant Liquor |
15000t/y |
—— |
| Organic Solvent Recycling System |
Industrial Organic Solvent Product |
1000t/y |
3000t/y |
| Hazardous Waste Transportation Fleet |
Special Hazardous Product Transportation and Treatment |
50000t/y |
—— |
| Storage |
Various Waste Storage Equipment |
—— |
—— |
| Waste Sorting and Filtrating System |
—— |
10000t/y |
—— |
Dalian Zhuorui Resource Recycling Co., Ltd
| Facility |
Description |
Scale |
| Phase1 |
Phase2 |
| Valuable Metals Recycling System |
Refining Cobalt, Nickel, Molybdenum and Vanadium by using Plasma Furnace |
5000T/Y |
10000T/Y |
Dong Tai Xia Jiahe Water Recycling Co., Ltd.
Facility |
Description |
Scale |
Phase1 |
Phase2 |
Sewage Treatment Plant |
BOT Project |
30000t/d |
100,000t/d |
Xia Jiahe Sewage Treatment Plant
The first BOT project being undertaken by the Company is a municipal sewage treatment plant in Dalian,operated by Dalian Dong Tai Xia Jiahe Water Recycling Co., Ltd., an 80% owned subsidiary of Dalian Dong Tai. The franchised operation is 20 years excluding construction period.
Dong Tai Xia Jiahe Water Recycling Company has imported the first set of international advanced technology from Germany called “constant water level sequencing batch reactor” (CWSBR). The second phase, with expected completion by 2010, will expand the facility to allow processing of up to 100,000 tons of municipal sewage per day.
Dong Tai Xia Jiahe Water Recycling Company has been approved by the Environmental Protection Bureau and is currently in commercial operation. We estimate that the Plant can generate approximately $1,000,000 per year, which will provide stable cash flow to the company. In the near future, we expect the operation scale to be expanded from 100,000 to 150,000 tons per day, as the surrounding areas continue to develop. Therefore, the revenue and profits should increase accordingly.
The Plant commenced operations on June 21, 2008, has processing capacity of approximately 30,000 metric tons per day. Since commencing commercial operations, the Company has received several quarterly payments from the local government based on the amount of waste water treated by the Plant.
Dalian Dong Tai Organic Waste Treatment Co., Ltd.
Facility |
Description |
Scale |
Phase1 |
Phase2 |
Sludge Treatment Plant |
BOT |
400T/D |
600T/D |
Dalian Lipp Environmental Energy Engineering & Technolgy Co., Ltd

Dalian Lipp Environmental Energy Engineering & Technology Co., Ltd. ("Dalian Lipp") is a joint venture company with Germany Lipp Co., and Dalian Dong Tai owns 75% of the interest. Dalian Lipp designs, manufactures and installs environmental protection equipment and renewable energy equipment and provides related technical services. The project is based on the Lipp tank building technique, and is dedicated to generating energy by organic waste anaerobic fermentation, and industrial effluent and municipal sewage treatment plant.
|